How to quote a CCTV installation job and still make a profit
CamVerion team · 7 November 2026 · 8 min read
A quote does two jobs. It persuades the customer to choose you, and it sets out what you have promised to deliver. Many installers focus on the first and forget the second, then end up absorbing costs that were never priced in.
This guide gives you a method for building a quote that is accurate, protects your margin and is easy for the customer to say yes to. The figures in the examples are invented to show the calculation, so use your own.
Survey first whenever you can
Remote quotes are tempting, especially for small jobs, but they are also where most nasty surprises come from. A site visit reveals what a phone call cannot, such as cable distance, ceiling type, power availability and the customer's real concerns. It also gives you a chance to build trust before anyone mentions price.
Use our CCTV site survey checklist to make sure you capture the essentials. If a survey truly is not practical, state your assumptions clearly in the quote and say that the final price depends on site conditions.
Understand what the customer actually needs
Before counting cameras, ask what problem they want to solve. The answer determines the design.
- What do they want to see, and what are they worried about? Theft at the entrance needs a different view from general monitoring of a warehouse.
- Do they need to identify a person or just see that somebody was there? This affects camera choice and position.
- How long do they need to keep recordings?
- Who will view footage, and from where? Do they want phone access?
- Do insurers, regulators or customers impose any requirements?
- What has gone wrong with any existing system?
These questions also separate you from the competitor who simply offers a low price per camera. For an honest comparison, you can explain how your design meets their real goal.
Build your cost from the ground up
Add up what the job will truly cost you, in five groups.
1. Equipment
Include cameras, recorder, drives, switches and any monitor, and use current purchase prices. Distributor prices can change quickly, which is why your quote should have an expiry date.
2. Installation materials
This group is often underestimated. Include cable, conduit, trunking, junction boxes, connectors, mounting brackets, power supplies, rack or enclosure, labels, screws, and sealing materials for outdoor connections. Add a realistic allowance for waste, especially on cable.
3. Labour
Estimate hours for each stage: running cable, mounting cameras, terminating, configuring, testing and handover. Then multiply by your true labour cost per hour. This should include more than wages, such as leave, benefits, tools and idle time between jobs. If you record job hours, you can use your real figures, which are more reliable than your memory.
4. Direct job costs
These include travel, parking, food if you provide it, equipment hire such as a scaffold, and any subcontractors. A remote job can carry surprisingly high costs in travel time alone.
5. Overheads and risk
Rent, office staff, software, vehicles and insurance need to be paid out of each job. A simple way to estimate this is to divide your monthly overheads by your typical billable labour hours, and add that rate to your labour estimate. Add a small allowance for risk where a site is uncertain, such as work in old buildings.
Add margin deliberately
Now decide what profit you need. Two common terms are often confused:
- Markup is profit as a percentage of cost. A cost of 100 sold for 125 is a 25% markup.
- Margin is profit as a percentage of the selling price. The same sale gives a 20% margin.
The formula for selling price from a target margin is:
Selling price = Cost ÷ (1 − target margin)
Here is an example, in simple units:
| Item | Amount |
|---|---|
| Equipment | 60,000 |
| Installation materials | 12,000 |
| Labour, 32 hours at 300 | 9,600 |
| Travel and other direct costs | 3,000 |
| Overheads, 32 hours at 150 | 4,800 |
| Total cost | 89,400 |
| Selling price at 20% margin (89,400 ÷ 0.8) | 111,750 |
| Profit | 22,350 |
If you applied a flat 20% on top instead, you would charge 107,280 and earn about 16.7% margin, not 20%. On a year's work, that difference adds up.
You need not use one margin for everything. Many installers use a lower margin on easily compared hardware and a higher one on labour and expertise, since those are harder to compare and are what really differentiates you.
Decide how to present the price
There are three common formats. None is always right.
- Itemised: every product and service is shown with a price. This is transparent and often required by business customers, but it invites customers to compare single items online.
- Package: one price for a defined system, such as "8-camera system, installed". This is simple and works well for small sites.
- Mixed: equipment lines with a separate installation charge. This is common and easy to read.
A good option for many jobs is to offer two or three choices, such as a basic and a recommended system. Customers can then decide between your options instead of only asking themselves whether to accept or reject you. Do keep it simple, as too many choices slow decisions down.
What every quote should say
A clear quote prevents arguments later. Check that yours includes:
- your company details and tax registration where applicable
- the customer's details and the site address
- a quote number, date and expiry date
- each item, with make, model or key specification
- quantities and units
- labour or a clear statement that it is included
- taxes, shown clearly
- payment terms and stages
- warranty, stating what is covered and for how long
- estimated start and completion time
- assumptions and exclusions
Exclusions deserve special attention
Say what you are not providing. Common examples are:
- power points or electrical work
- internet connection and router configuration
- civil work, such as digging or core cutting
- repainting or repair after installation
- scaffolding or lifts
- cable beyond a stated length
- work outside normal hours
For cable, a useful phrase is "up to X metres included, additional cable charged at Y per metre". This single line can prevent a lot of disputes.
Set sensible payment terms
Stage payments protect your cash flow, since you buy equipment before the customer pays in full. A typical structure is an advance when the order is placed, a payment when material arrives or work starts, and the balance on completion. The percentages depend on your market and the customer, and larger customers may have their own terms.
Say clearly what counts as completion, such as a signed handover note. Then the final payment does not depend on an open-ended idea of when the customer feels the work is done.
Speed and follow-up win jobs
A good quote sent late often loses to a decent quote sent early. Aim to send small quotes the same day or the next day. Templates for your common packages make this realistic.
Then follow up. Many sales are lost simply because no one asked again.
- Same day: confirm that they received it, and offer to explain it.
- After two or three days: ask if they have questions.
- Before expiry: a reminder gives a natural reason to get in touch.
- After a loss: politely ask why. Over time, these answers will show you what to change.
Tracking each quote's status means that these follow-ups do not rely on memory. When you see a list of quotes marked Sent, you know who to call.
Handling "your price is too high"
Do not reach for a discount immediately. First find out what they are comparing.
- Compare specifications. Check resolution, storage days, cable type, warranty and whether labour and accessories are included. The cheaper quote may simply cover less.
- Explain the differences. Say what your price includes and why that matters, without criticising your competitor.
- Reduce scope, not your margin. If budget is the real issue, offer fewer cameras now with room to add more later, or a smaller storage option. This keeps your price honest.
- Know when to walk away. A job you can only win at a loss will not help your business. A customer won on price alone may also be the first to leave.
If you do give a discount, ask for something in return, such as a larger advance payment or a maintenance contract.
Avoid these common mistakes
- Using last month's prices. Always check equipment prices on larger jobs, and keep your validity period short.
- Forgetting small items. Connectors and brackets add up quickly.
- Underestimating configuration. Time spent on the network, phone apps and handover is real work.
- Ignoring return trips. Allow for the visit needed to fix snags.
- No change process. When the customer adds a camera on site, confirm the extra cost in writing before installing it.
- Quoting compliance loosely. Check that the equipment meets the rules and any customer requirements. Our guide on Section 889 and FCC rules explains what to look for.
Learn from every job
Once a job is done, compare the quote with what really happened. Did the hours match? Was there extra cable? Did you make the margin you planned? Doing this for even a few jobs a month will gradually improve your estimates.
If you want a faster process, see how quotes work in CamVerion. Otherwise, a careful spreadsheet can still do the job. What matters is that you use one method every time, based on your own real costs.